Project description
Gleisdorf – During the construction of apartment blocks and blocks of flats, polyethylene sewer manholes of DN600 diameter and 1.25 m high with a 3/1 mulch were used for the construction of utility lines. Graz – During the construction of the Sporthalle Graz, sewer manholes of DN600 diameter were laid in a reinforced concrete slab. DN600 sewer manholes were installed in the reinforced concrete slab. DN600 sewer manholes were installed in the reinforced concrete slab of the Sporthalle Graz. Graz The connection of a housing estate to the public sewer system involved the installation of sewer manholes of various diameters and heights. Wildon – During the construction of the twin towers in the Wildon estate, located along the motorway to Graz, several polyethylene sewer manholes with a diameter of DN1000 and of various heights were used for the installation of the public sewer lines. Pack – The settlement of Pack, west of Graz, has been equipped with ROTO shafts.