Our technical team is currently installing and preparing the SBR-Q sewage treatment plant for the needs of a new camp (River Camping Bled) with a size of up to 500 population units.

The treatment plant was carefully designed to ensure the highest possible level of protection of the natural environment, especially taking into account the proximity of the Triglav National Park and the outlet of the treatment plant to the river Sava Dolinka. 

The “River Camping Bled” campsite is currently under construction and will open on the 1st. July 2020. More information: https://www.rivercamping-bled.si/si/

Recommended Posts